R2v3 – Appendix G: Photovoltaic (PV) Modules

R2v3 – Appendix G: Photovoltaic (PV) Modules

Appendix G of the R2v3 Standard covers photovoltaic (PV) modules — solar panels — setting requirements for facilities that handle them. It’s the newest part of R2v3, added in early 2024 (SERI’s board approved it in January 2024) in response to the rising tide of end-of-life solar panels that need responsible handling as the first big generation of installations ages out.

If your facility handles solar panels, Appendix G is the appendix to look at, and it’s the one most likely to be new territory even for experienced electronics recyclers.

Why PV Modules Got Their Own Appendix

Solar panels aren’t quite like other electronics. They’re large, they’re installed outdoors for decades, some contain hazardous materials, and a damaged panel can present electrical and safety risks that a dead laptop doesn’t. As the solar industry’s earliest installations reach end of life, the volume of panels needing reuse or recycling is climbing fast, and Appendix G was added to make sure they’re handled safely and in an environmentally sound way rather than stockpiled or dumped.

When Appendix G Applies

The trigger is taking control of the panels. If your R2 facility receives, processes, stores, transports, or brokers PV modules, plan on certifying to Appendix G, and SERI’s guidance counts work done for others where you don’t own the modules. The practical way to stay out of scope is simply not to take control of them: if no PV modules are physically received at or pass through your facility, and you don’t broker them, Appendix G is unlikely to apply. As with every R2v3 appendix, confirm the edge cases with your certification body before you scope.

If You’re Already R2v3 Certified

Appendix G isn’t only for newcomers. According to SERI’s guidance, facilities that control PV modules aren’t required to add Appendix G to their scope until 31 January 2027, and until then a downstream vendor that hasn’t yet added it can still be qualified under the non-R2 vendor process. If you handle PV modules, that date is your planning horizon, so ask your certification body how to add Appendix G to your existing certificate and confirm the current deadline with them.

What Appendix G Requires

Appendix G builds on the rest of R2v3 rather than replacing it, then adds PV-specific requirements on top. At a high level, a facility handling PV modules should expect to:

  • Manage PV modules as an R2 Controlled Stream. That brings the general R2 requirements — legal compliance, downstream accountability, and tracking — to the modules you receive, just as for other electronics. A module stops being a Controlled Stream once it has been tested, confirmed functional, and assigned an R2 equipment category, or once its Focus Materials reach a depollution or recycling outlet.
  • Evaluate every module for reuse potential before treating it as scrap, looking at its functionality, its physical condition, and its value in the destination market. If you plan to test or repair modules for reuse, Appendix C (Test and Repair) applies.
  • Account for PV-specific safety hazards. Electrical and physical hazards fall under the EH&S requirements in your legal compliance plan (Core Requirement 4), and SERI expects downstream vendors handling PV modules to identify and assess their hazards.
  • Watch how long end-of-life modules sit. Under Core Requirement 5, negative-value material, which usually describes modules at end of life, generally can’t be stored longer than one year.

For the exact wording of each requirement, read Appendix G in the Standard itself, since the details matter when you’re building procedures around it.

How Appendix G Connects to the Other Appendices

Appendix G rarely operates alone. It tends to route into the rest of the series depending on what you do with the panels:

So Appendix G is less a standalone track than a PV-specific layer that pulls in whichever other appendices match how you handle the panels. That’s worth understanding before you scope: adding solar to your operation can bring several appendices into play at once.

The Bottom Line

Appendix G is R2v3’s response to the coming wave of end-of-life solar panels. It extends the R2 framework to PV modules and adds PV-specific safety and handling requirements on top. Any facility taking control of solar panels needs to look at it, and because it connects into test and repair, materials recovery, brokering, and the downstream chain, it’s worth scoping carefully rather than treating it as a simple add-on. For recyclers eyeing the growing solar-recycling market, it’s the appendix that makes that work auditable and responsible.

Quick answers

What is R2v3 Appendix G? The appendix covering photovoltaic (PV) modules — solar panels — requiring safe handling, evaluation for reuse, and responsible recovery. It was added to R2v3 in early 2024.

When does Appendix G apply? When an R2 facility receives, processes, stores, transports, or brokers PV modules. If you never take control of them, it’s unlikely to apply, but confirm the edge cases with your certification body.

I’m already R2v3 certified. Do I have to add Appendix G? If you control PV modules, yes. SERI’s guidance sets 31 January 2027 as the date by which facilities that control them must add it to their scope. Ask your certification body how to add it to your certificate and confirm the current deadline.

Do PV modules count as a Controlled Stream? Yes. Appendix G requires modules you receive to be managed as an R2 Controlled Stream until they are tested, confirmed functional, and categorized, or their Focus Materials reach a depollution or recycling outlet.

Does Appendix G replace the other appendices for solar panels? No. It adds PV-specific requirements, and depending on what you do with the panels it is likely to sit alongside Appendix C (test and repair), E (materials recovery), F (brokering), and A (downstream).

Moving into solar panel reuse or recycling and need to scope Appendix G correctly? Score your facility with our free R2v3 readiness quiz, or book a free readiness call and we’ll help you map which appendices apply.